SAY NO TO GOPHER TO BADGER LINK.
THEIR CURRENT PROPOSED ROUTE IS GOING RIGHT OVER/ON OUR FARM. We are actively fighting to stop this project but need all the help we can get!!
Gopher to Badger Link is a proposed 765 kV powerline that connects the North Rochester substation to Marion and then on to cross the Mississippi River
It is part of a much larger project connecting South Dakota to Wisconsin, but is broken into multiple sections (WHY? An excellent question and one without a clear reason other than to make it really confusing thus harder to fight)
765kV powerlines are THE BIGGEST powerlines allowed in the states and are currently ONLY on the coasts (these would be the first built in the state of Minnesota)
They require a 250ft right-of-way easement and need 150-175 ft tall transmission towers spaced every 1200-1400 ft
Xcel says its for the green transition and to make the grid more stable BUT conveniently this goes right by Pine Island’s propsed data center
Where: Bleed Heart Floral Farm
59814 415th Ave, Mazeppa, MN, 55956
When: Saturday, August 22nd 5:30PM
Cost: suggested $40 donations for live music, drinks, and pizza ALL ADDITIONAL PROCEEDS GO TO Carol Overland, the lawyer representing our area to fight the proposed Gopher to Badger Poweline project
***Feel free to use this to prepay for the 8/22 event or if you would like to donate but can’t make the event. Otherwise $40 is a suggested donation—pay whatever you want OR bring cash/check for onsite payment!!
SAY NO TO GOPHER TO BADGER LINK.
THEIR CURRENT PROPOSED ROUTE IS GOING RIGHT OVER/ON OUR FARM. We are actively fighting to stop this project but need all the help we can get!!
Gopher to Badger Link is a proposed 765 kV powerline that connects the North Rochester substation to Marion and then on to cross the Mississippi River
It is part of a much larger project connecting South Dakota to Wisconsin, but is broken into multiple sections (WHY? An excellent question and one without a clear reason other than to make it really confusing thus harder to fight)
765kV powerlines are THE BIGGEST powerlines allowed in the states and are currently ONLY on the coasts (these would be the first built in the state of Minnesota)
They require a 250ft right-of-way easement and need 150-175 ft tall transmission towers spaced every 1200-1400 ft
Xcel says its for the green transition and to make the grid more stable BUT conveniently this goes right by Pine Island’s propsed data center