8/22 Event Ticket

$40.00

Where: Bleed Heart Floral Farm

59814 415th Ave, Mazeppa, MN, 55956

When: Saturday, August 22nd 5:30PM

Cost: suggested $40 donations for live music, drinks, and pizza ALL ADDITIONAL PROCEEDS GO TO Carol Overland, the lawyer representing our area to fight the proposed Gopher to Badger Poweline project

***Feel free to use this to prepay for the 8/22 event or if you would like to donate but can’t make the event. Otherwise $40 is a suggested donation—pay whatever you want OR bring cash/check for onsite payment!!

SAY NO TO GOPHER TO BADGER LINK.

THEIR CURRENT PROPOSED ROUTE IS GOING RIGHT OVER/ON OUR FARM. We are actively fighting to stop this project but need all the help we can get!!

  • Gopher to Badger Link is a proposed 765 kV powerline that connects the North Rochester substation to Marion and then on to cross the Mississippi River

  • It is part of a much larger project connecting South Dakota to Wisconsin, but is broken into multiple sections (WHY? An excellent question and one without a clear reason other than to make it really confusing thus harder to fight)

  • 765kV powerlines are THE BIGGEST powerlines allowed in the states and are currently ONLY on the coasts (these would be the first built in the state of Minnesota)

  • They require a 250ft right-of-way easement and need 150-175 ft tall transmission towers spaced every 1200-1400 ft

  • Xcel says its for the green transition and to make the grid more stable BUT conveniently this goes right by Pine Island’s propsed data center

Where: Bleed Heart Floral Farm

59814 415th Ave, Mazeppa, MN, 55956

When: Saturday, August 22nd 5:30PM

Cost: suggested $40 donations for live music, drinks, and pizza ALL ADDITIONAL PROCEEDS GO TO Carol Overland, the lawyer representing our area to fight the proposed Gopher to Badger Poweline project

***Feel free to use this to prepay for the 8/22 event or if you would like to donate but can’t make the event. Otherwise $40 is a suggested donation—pay whatever you want OR bring cash/check for onsite payment!!

SAY NO TO GOPHER TO BADGER LINK.

THEIR CURRENT PROPOSED ROUTE IS GOING RIGHT OVER/ON OUR FARM. We are actively fighting to stop this project but need all the help we can get!!

  • Gopher to Badger Link is a proposed 765 kV powerline that connects the North Rochester substation to Marion and then on to cross the Mississippi River

  • It is part of a much larger project connecting South Dakota to Wisconsin, but is broken into multiple sections (WHY? An excellent question and one without a clear reason other than to make it really confusing thus harder to fight)

  • 765kV powerlines are THE BIGGEST powerlines allowed in the states and are currently ONLY on the coasts (these would be the first built in the state of Minnesota)

  • They require a 250ft right-of-way easement and need 150-175 ft tall transmission towers spaced every 1200-1400 ft

  • Xcel says its for the green transition and to make the grid more stable BUT conveniently this goes right by Pine Island’s propsed data center